Journal of Marine Science and Engineering - MDPI
www.mdpi.com › 2077-1312 › 9The statements, opinions and data contained in the journal Journal of Marine Science and Engineering are solely those of the individual authors and contributors and not of the publisher and the editor(s). MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Suezmax - Wikipedia
en.wikipedia.org › wiki › SuezmaxDescription. The current channel depth of the canal allows for a maximum of 20.1 metres (66 ft) of draft, meaning that a few fully laden supertankers are too deep to fit through, and either have to unload part of their cargo to other ships ("transhipment") or to a pipeline terminal before passing through, or alternatively avoid the Suez Canal and travel around Cape Agulhas instead.